Joe's Roofing Solutions
A roofer tearing off old shingles down to the deck on the gable end of a two-storey house.

Roof replacement

A new roof, built from the deck up.

Old roof off, wood checked and repaired, then a complete new system on — usually inside one to three days.

Roof replacement

What a replacement actually involves.

A roof is not one product, it is five or six working together.

The old material comes off so the deck can be inspected. Everything above it then goes back new.

Membrane, underlayment, starter, field shingles, hip and ridge, flashing, venting — that is the difference between a roof that lasts and one that only looks new.

  • Tear-off to the deck so soft or rotten sheathing is found and replaced.
  • Ice and water shield at the eaves, valleys and every penetration.
  • Ridge venting sized for the attic, not just whatever was there before.
  • Landscaping tarped, magnet sweep before we leave.
A roof stripped to new plywood decking with underlayment being run along the edge.

On the roof

Roof replacement — recent jobs.

Bundles staged on a stripped roof
Synthetic underlayment under the first courses
Architectural shingles, valley to ridge
Finished roof with continuous ridge vent
Roofers working on a house with a ladder up to a partly re-shingled roof.

Roof replacement

Houses, garages and manufactured homes.

Steep, low-pitch, long and narrow, or a garage on its own — we quote it the same way and build it the same way.

Questions

Roof replacement, answered.

How long does a full replacement take?

Most houses are a one- to three-day job. Size, pitch and how much decking needs replacing are what move it.

Do I have to tear off, or can you go over the old shingles?

A layover is occasionally the right call, but it hides the deck and shortens the life of the new roof. We will tell you honestly which one your house should have and why.

What happens if you find rotten wood?

We show you, and replace it. Decking is the one thing nobody can price exactly before the old roof is off, so we agree how it is handled before we start — never as a surprise at the end.

Do you handle the old roof and the mess?

Yes. Everything that comes off leaves with us the same day, the drive and lawn get a magnet sweep, and the gutters are cleared of debris before we go.

Also on the truck

While we are there.

Free quote

Get a quote for roof replacement.

Send the address and what the roof is doing. Joe’s will come back to set up a free inspection.

  • The inspection and the quote are free — nothing to pay to find out where you stand.
  • Photos help: a ceiling stain, a missing shingle, a sagging gutter.
  • Storm or hail claim? Say so and we will document it for your insurer.
Call or text(734) 249-2724
What does the roof need?

Your details go straight to Joe's Roofing Solutions so they can set up the inspection. Nothing else, ever.

(734) 249-2724 Free inspection